연구 분야: Networking
학회: International Conference on Mobile Multimedia Communications
In this study, a comprehensive evaluation model based on TOPSIS planning and multi-objective planning for hydro power plant siting problem is proposed. First, several factors such as economic, environmental and social are identified. Through the study of the hydropower plant siting problem, these factors are quantified as evaluation indicators and input into TOPSIS to select a number of candidate plant sites. Then, risk assessment is performed using 5G technology. The risks as well as benefits of each selected finger point are obtained through a multi-objective planning algorithm to comprehensively evaluate the candidate sites and optimize the score of multi-objective sites to achieve the best site selection plan. The experimental results show that the proposed comprehensive evaluation model achieves good results in terms of accuracy and feasibility of the site selection scheme. In addition, the application of 5G technology for multi-source data collection can also improve the accuracy of the model, which provides strong support for the research and practice of the model.
| 발행 연도 | 2024년 |
|---|---|
| 인용수 | 0 |
| 출판 국가 | Andorra |
| 사이트 | Springer |
| 좋아요 수 | 0 |